A 2002 review of the status of fire protection systems, equipment and fire fighting/emergency response capability at the Valdez Marine Terminal. In response to a State Fire Marshal directive in 2003 to become compliant with code, Alyeska designed and installed oelophillic skimmer systems in the gravity separation tanks. Eductor-based foam system upgrades were installed at East and West Meters, and both were successfully tested in 2004. In early 2004, as part of its proposed Strategic Reconfiguration, Alyeska invited one of the council’s fire protection consultants to participate in an assessment of risk associated with installing and operating floating roof systems under the fixed-roof crude oil storage tanks..
File Type:
pdf